CCNA: EtherChannel with LACP

Two uplinks connect the distribution switches, but STP blocks one of them. Bundle them into one LACP EtherChannel trunk.

Tasks

  1. On SW1 put Gi0/1–2 in channel-group 1 with LACP mode active.
  2. On SW2 put Gi0/1–2 in channel-group 1 with LACP mode passive.
  3. On both switches make Port-channel 1 a trunk.
  4. Verify with show etherchannel summary: Po1(SU) with both ports (P).